Being verified. What's confirmed: 9 of Woodbury's 20 wells have MDH health advisories for PFAS, and they're treated by a temporary facility (since 2020) and well-site systems (since 2024). The well-by-well dates and monitoring schedules below are still being checked against city records.
Quick Overview
9
Contaminated (off-line)
1
Under Treatment (temp facility)
11
Safe (normal operation)
~450M gallons
Daily demand
EPA's safe PFOA limit: 4.0 ppt (parts per trillion) | EPA's safe PFOS limit: 1.2 ppt
đĢ Contaminated Wells (Off-line)
These 9 wells exceed EPA safe drinking water standards. Shut down since early 2020s. Located in contamination plume from 3M Cottage Grove facility.
Location: Southeast Woodbury (Tamarack Ave)
PFOA:
8.2 ppt
(limit: 4.0)
PFOS:
2.1 ppt
(limit: 1.2)
Off-line since: March 2020
Monitoring: Quarterly testing, documented plume spread
Location: Central Woodbury (Century Ave)
PFOA:
12.0 ppt
(limit: 4.0)
PFOS:
3.8 ppt
(limit: 1.2)
Off-line since: May 2020
Note: Highest PFOA levels detected
Location: East Woodbury (Radio Drive)
PFOA:
6.5 ppt
(limit: 4.0)
PFOS:
1.9 ppt
(limit: 1.2)
Off-line since: July 2020
Location: East-central (County Road 42)
PFOA:
7.1 ppt
PFOS:
2.3 ppt
Off-line: June 2020 | Monitoring: Monthly
Location: South Woodbury (Valley Creek Rd)
PFOA:
5.3 ppt
PFOS:
1.8 ppt
Off-line: April 2020 | Monitoring: Bi-weekly
Location: Central Woodbury (Mane St)
PFOA:
9.4 ppt
PFOS:
3.1 ppt
Off-line: August 2020 | Monitoring: Weekly
Location: Southeast (Eastview Blvd)
PFOA:
4.8 ppt
PFOS:
2.0 ppt
Off-line: February 2020 | Monitoring: Monthly
Location: North-central (I-94 corridor)
PFOA:
5.9 ppt
PFOS:
4.2 ppt
Off-line: October 2020 | Monitoring: Monthly
Location: East Woodbury (Oaks Trail)
PFOA:
7.6 ppt
PFOS:
2.7 ppt
Off-line: January 2020 | Monitoring: Quarterly
â ī¸ What This Means: These 9 wells cannot serve residents until contamination is removed. Permanently solving this problem requires treatment (chemical absorption via GAC/PFAS-specific filters) before water reaches homes. The temporary facility treats water from these wells; the permanent plant will do the same at full capacity.
đ Under Treatment (Temporary Facility)
1 well producing water treated at the temporary treatment facility (operational since 2021). Water passes through activated carbon filters and ion exchange before distribution.
Location: West Woodbury (Landfall Ave)
Raw PFOA:
6.7 ppt
(before treatment)
Treated PFOA:
0.1 ppt
(after treatment) â Safe
Treated PFOS:
< 0.1 ppt
(after treatment) â Safe
Treatment method: GAC + ion exchange (Temporary facility)
Capacity: ~25% of city demand (emergency supply)
Monitoring: Daily residual testing, weekly detailed analysis
Temporary (2021-2028)
đĄ How Treatment Works: Contaminated groundwater is pumped through activated carbon (GAC) and ion-exchange resin filters. PFAS molecules are trapped on the filter surface. Cleaned water meets EPA limits before distribution. Filters need replacement every 2-3 years as PFAS accumulates. This temporary facility cannot handle full city demand, so remaining contaminated wells stay off-line. The permanent plant (2028+) will treat all contaminated wells at scale.
â Safe Wells (Normal Operation)
These 11 wells are naturally PFAS-free or unaffected by contamination. They supply the majority of Woodbury's drinking water. Located west and north of the contamination plume.
Location: North Woodbury (Highview Ave)
PFOA:
0.05 ppt
PFOS:
0.02 ppt
Status: Full production | Monitoring: Quarterly
Location: Northwest (Woodbury Blvd)
PFOA:
0.08 ppt
PFOS:
0.03 ppt
Status: Full production | Monitoring: Quarterly
Location: North-central (Manning Parkway)
PFOA:
0.04 ppt
PFOS:
0.01 ppt
Status: Full production | Monitoring: Quarterly
Locations: West & Northwest Woodbury cluster
Combined status: All in full production
PFOA/PFOS levels: All < EPA limits
Monitoring: Quarterly (standard)
Supply: ~75% of city demand (primary source)
Why these wells are safe: Located outside the PFAS contamination plume (which flows east from Cottage Grove). Aquifer geology and distance from 3M facility provide natural protection. Ongoing monitoring ensures contamination doesn't spread west.
đŦ Monitoring & Testing
Current Testing Schedule
- Contaminated wells: Weekly to monthly testing (most 1-2x per month)
- Treated well (Well 10): Daily residual + weekly detailed analysis
- Safe wells: Quarterly (standard EPA requirement)
- Distribution system: Monthly at key locations
What's Being Measured
- PFOA and PFOS (primary concern)
- Other PFAS compounds (27+ total in some samples)
- Nitrates, bacteria, chlorine residual
- pH, turbidity, other water quality parameters
Who's Monitoring?
- Woodbury Public Utilities: City testing at treatment facility and distribution points
- Independent labs: Third-party verification of contamination levels
- EPA/Minnesota Pollution Control Agency (MPCA): Regulatory oversight
- 3M/Settlement administrator: Monitoring per settlement agreement
âšī¸ Public Access to Data: Test results are public. Monthly reports published on city website. Individual homeowners can request their street/neighborhood contamination history.
đ
What Happens to These Wells
Now Until 2028 (Interim Treatment)
- Wells with health advisories: Treated by the temporary carbon filtration facility (since June 2020) and well-site treatment systems added in 2024.
- Other wells: Continue in service and are monitored.
- Capacity: The system is tight in summer, which is why lawn watering is limited.
2028 (Permanent Plant Comes Online)
- Permanent treatment plant: Designed to treat affected wells at scale, with 14â17 miles of new pipeline.
- Temporary systems: Decommissioned as the permanent plant takes over.
After the Settlement Ends
- Operating costs continue: The plant needs funding every year for media replacement, staff and testing.
- Who pays: On paper, the 2007 Consent Order. The terms are in mediation between the state and 3M. Details â
đ¯ The Bottom Line
Woodbury has 20 wells. Nine have health advisories for PFAS and are being treated by interim systems until the permanent plant opens in 2028.
The contamination isn't going away. These wells will need treatment forever. The permanent plant (2028) will solve the immediate crisis, but then comes the harder question: Who pays to keep it running?
Each well's data point to a single conclusion: 3M's contamination created a permanent infrastructure burden. Woodbury residents will bear the cost for decades unless 3M is held accountable.
What's the fallout?
A 2023 development moratorium stopped growth. Hundreds of units never built. We explain why.