From the state's own October 2026 report to the Legislature (MPCA and DNR, the settlement's Co-Trustees):

$446.4M
Left in the drinking water fund on June 30, 2026, after $162.4M was spent in FY2026
$133.4M
Planned spending for FY2027 (July 2026 – June 2027), leaving roughly $313M
$3.3M
Spent in FY2026 to operate temporary and permanent treatment plants across five cities, including Woodbury
"Capital infrastructure costs projected over the next several years surpass 3M Settlement dollars available." — 3M Settlement annual report, October 2026
"The end of the 3M Settlement fund is expected much sooner than previously anticipated." — 3M Settlement annual report, October 2026
Correction. Earlier versions of this page said the fund would be "largely exhausted" in 2027 and that operating costs would be $4–6M a year. The state's October 2026 report shows money remaining after FY2027, and the city has not published an operating cost figure. The real risk isn't a fixed 2027 cliff. It's the terms of what happens when the fund ends.

📅 How We Got Here

2007

Consent Order: A separate legal agreement between the State and 3M. It requires 3M to fund treatment for drinking water wells that exceed state health guidance.

February 2018

$850M settlement: About $720M remained after legal and other expenses. Investment earnings have added more than $100M since, bringing the total to roughly $820M.

2024

Standards tighten: In January, MDH lowered its health-based values for PFOS (2.3 ppt) and PFOA (0.0079 ppt). In April, EPA set enforceable limits of 4 ppt. More wells exceeded the limits than the 2021 plan expected, and costs climbed.

Late 2024 – 2028

Woodbury's plant: Construction of a roughly $300–330M treatment plant and pipelines. The city says about 93% is covered by the settlement, and its own share is under $20M.

Now

Mediation: "The Co-Trustees are in mediation with 3M Company regarding the eventual transition from 3M Settlement funds to the 2007 Consent Order."

Date not public

The fund ends: The state tracks the date the fund will be fully committed but doesn't publish it. After that, the 2007 Consent Order is supposed to take over.

❓ The Real Question

⚠️ On paper, 3M keeps paying. In practice, it's being negotiated.

The promise: Woodbury's assistant public works director told FOX 9 in 2025, "It was thought that operation and maintenance costs would be covered for 20 years," and added, "there's some uncertainty on that."

The dispute: 3M is challenging whether some projects are "reasonable and necessary" under the 2007 Consent Order, and has asked for an independent review of how settlement money is spent.

What's at stake: Building the plant is paid for. Running it is not settled. Carbon media, chemicals, operators and testing are needed every year. PFAS doesn't break down.

💰 What It Could Cost You

If 3M stops paying to operate the plant, here is our estimate of the added cost per household. It covers only the water portion of the bill, not sewer or stormwater.

ConservativeHigh
Annual plant operating cost$3M$6M
Share paid by homes70%100%
Added cost per household (2028)+$18/quarter+$51/quarter
Increase on the water portion of the bill+30%+85%
Same scenario in 2035 (3% inflation)+39%+111%

How we got these numbers:

  • The city says the plant will cost "several millions of dollars annually" to run but hasn't published a figure. $3M and $6M are our low and high readings of that.
  • We spread the cost over 29,312 households (U.S. Census, 2020–2024).
  • Today's bill uses the city's 2026 residential rates ($10.20 per quarter plus $2.50 per 1,000 gallons) at 20,000 gallons per quarter, which comes to about $60 a quarter for water.
  • If the Consent Order covers operations in full, the added cost to residents is close to $0.
💡 If our numbers are wrong, the city should publish theirs. Residents deserve the plant's real operating budget and rate projections before the 2027 budget and utility rates are adopted.

🔮 How This Could Play Out

Nobody outside the mediation knows the odds. These are the possible outcomes.

3M covers operations

The Consent Order transition funds treatment, including operations, for as long as wells exceed health limits. Residents see little or no PFAS-related rate increase.

Partial coverage

The mediation produces a compromise. 3M pays some operating costs, and cities and ratepayers cover the rest.

3M wins the disputes

Costs ruled not "reasonable and necessary" fall to the city. In Cottage Grove, Ryan Burfeind told the Star Tribune "the only option would be to increase water rates."

State or federal help

Woodbury and its legislators have sought a state sales-tax exemption on construction materials. That lowers building costs, not ongoing operations.

✋ What We're Asking the City

  • Publish the operating budget: the plant's expected annual operating cost, with rate projections for 2028, 2030 and 2035 if 3M stops paying.
  • Report on the mediation: who represents Woodbury, and whether we are demanding that operations be covered for as long as PFAS is in our water.
  • A public hearing on PFAS rate increases: no PFAS-related rate increase without its own hearing.
  • Rate assistance: help for families who can't absorb an increase.
  • Work with other cities: coordinate with Cottage Grove, Hastings, Lake Elmo, Oakdale and the other East Metro communities.

🎯 The Bottom Line

3M paid for the filter. The question is who pays to change it.

The settlement built Woodbury's plant. Whether it keeps running without landing on our water bills depends on a mediation residents can't see. The city should tell us where it stands before the bill arrives.